|
|
|
|
LEADER |
00976cam a2200265 7i4500 |
001 |
0000056638 |
005 |
20190821090000.0 |
007 |
Monographs |
008 |
190821 eng |
020 |
|
|
|a 9789670997230 (pbk.)
|
040 |
|
|
|a UiTM
|
090 |
0 |
0 |
|a TA151
|b CON 2018
|
110 |
2 |
0 |
|a Construction Industry Development Board Malaysia
|
245 |
1 |
2 |
|a A Guide to Malaysian civil engineering standard method of measurement (MyCESMM 2)
|c edited by Construction Industry Development Board Malaysia.
|
250 |
|
|
|a Second Edition.
|
264 |
|
4 |
|a ♭2018.
|
264 |
|
1 |
|a Kuala Lumpur, Malaysia:
|b Construction Industry Development Board Malaysia,
|c 2018.
|
300 |
|
|
|a 300 pages:
|b colors,illustrations;
|c 30cm.
|
336 |
|
|
|a text
|2 rdacontent
|
337 |
|
|
|a unmediated
|2 rdamedia
|
338 |
|
|
|a volume
|2 rdacarrier
|
501 |
0 |
0 |
|a BQSI
|
504 |
0 |
0 |
|a Includes bibliographical references and Index
|
650 |
0 |
0 |
|a Civil engineering --
|x Handbooks, Manyal, etc
|
856 |
|
|
|u http://www.cidb.gov.my
|