Reduction of Downtime of The Durville Die Casting Machine at Enkei (M) Sdn. Bhd. MACI Production Plant Line A, Using Total Productive Maitenance (TPM) and Condition-Based Maintenance (CBM) Approach

Main Author: Nelson, David Bassey
Format: Book
Published: ♭2017.
Subjects:
Online Access:http://intilib.intimal.edu.my/equip-intin/custom/home.jsp
LEADER 01260pamaa2200265 4500
001 0000054779
005 20181004090000.0
008 180829 Eng
040 |a TSAM Library 
090 0 0 |a TJ145   |b NEL 2017 
100 1 1 |a Nelson, David Bassey  
245 1 0 |a Reduction of Downtime of The Durville Die Casting Machine at Enkei (M) Sdn. Bhd. MACI Production Plant Line A, Using Total Productive Maitenance (TPM) and Condition-Based Maintenance (CBM) Approach   |c Nelson David Bassey. 
264 1 |a ♭2017. 
264 0 |a Nilai:   |b INTI International University,   |c January 2017. 
300 |a ix, 67:   |b ill.;   |c 30 cm. 
336 |a text  |2 rdacontent 
337 |a unmediated  |2 rdamedia 
338 |a volume  |2 rdacarrier 
500 0 0 |a BEng (Hons) in Mechanical Engineering January 2017 
500 0 0 |a BMEGI 60 
502 0 0 |a Being a project report submitted to INTI International University as a requirements for Bachelor Of Engineering (Hons) in Mechanical Engineering Augus 2018 under the managment and supervision of Faculty of Engineering & Quantity Surveying, INTI International University 
650 0 0 |a Mechanical Engineering  
650 0 0 |a Dissertations, academic --   |x Engineering  
650 0 0 |a BMEGI  
856 |u http://intilib.intimal.edu.my/equip-intin/custom/home.jsp