|
|
|
|
LEADER |
00967pamaa2200193 4500 |
001 |
0000053657 |
005 |
20151016090000.0 |
008 |
151016s2015 eng |
090 |
0 |
0 |
|a TA545
|b DES 2015
|
100 |
1 |
1 |
|a Desmond Lim Eng Hong
|
245 |
1 |
0 |
|a Financial barriers in achieving CIDB IBS roadmap in Malaysia private sector construction industry
|c Desmond Lim Eng Hong.
|
260 |
|
|
|a Nilai:
|b INTI International University,
|c April 2015.
|
300 |
|
|
|a xi, 106p:
|b ill.;
|c 30 cm.
|
500 |
|
|
|a BQSI 55
|
502 |
0 |
0 |
|a Dissertation submitted as a partial fulfillment of the requirement for the Bachelor of Science (Hons.) In Quantity Surveying submitted to INTI International University and under the management and supervision of Faculty of Science, Technology, Engineering and Mathematics
|
650 |
0 |
0 |
|a Cost estimation
|
650 |
0 |
0 |
|a Cost control
|
650 |
0 |
0 |
|a Dissertations, academic --
|x Engineeering
|
856 |
0 |
0 |
|u http://intilib.intimal.edu.my/equip-intin/custom/home.jsp
|