The study on the economic impacts of the abandoned projects in Malaysia
Main Author: | Hsieh Ying Shin |
---|---|
Format: | Book |
Published: |
Nilai:
INTI International University,
November 2014.
|
Subjects: |
Similar Items
-
Contractor-related factors and effects contributing to project time delay
by: Tey Khai Theng
Published: (2014) -
The causes, impacts of and ways to mitigate the delay effectively in construction industry
by: Wardah Musfirah Ghazali
Published: (2014) -
A study on awareness of the construction personnel toward the implementation of exempt supply GST on residential property
by: Kwan Wing Sin
Published: (2014) -
Extension of time in construction industry
by: Tan Ying Xuan
Published: (2013) -
The impact caused by the natural disaster in Malaysia : flood ad landslide
by: Yong Yoong Kee
Published: (2013)