A study into delay and extension of time in construction contract based on PAM from 2006 and PWD Form 203A 2007
Main Author: | Tay Khar Wern |
---|---|
Format: | Book |
Published: |
Nilai:
INTI International University,
January 2014.
|
Subjects: |
Similar Items
-
A study into the 'extension of time' clause 23 PAM form of contract PAM 1998 and its implication to the client and contractor
by: Yap Chor Yin
Published: (2012) -
A study into the comparison of contractual matter related with extension of time between PAM from 2006 and JKR form 2007
by: Yong Yoong Kee
Published: (2011) -
A study into design, costing to the soft and hard landscaping work to a project at Johor
by: Gan Xin Yi
Published: (2014) -
A study into the process of manufacturing of cement sand bricks in a factory for local market
by: Lee Jet Shi
Published: (2014) -
A study into the refurbishment of an existing cafeteria in INTI International University
by: Chan Yin Pang
Published: (2014)