Skip to content
VuFind
Advanced
  • A study into delay and extensi...
  • Preview
  • Cite this
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
    • Export to MARC
    • Export to MARCXML
Cover Image
QR Code

A study into delay and extension of time in construction contract based on PAM from 2006 and PWD Form 203A 2007

Main Author: Tay Khar Wern
Format: Book
Published: Nilai: INTI International University, January 2014.
Subjects:
Project paper -- > Quantity Surveying Enginnering
Construction -- > Composit materials
  • Holdings
  • Description
  • Preview
  • Similar Items
  • Staff View

Similar Items

  • A study into the 'extension of time' clause 23 PAM form of contract PAM 1998 and its implication to the client and contractor
    by: Yap Chor Yin
    Published: (2012)
  • A study into the comparison of contractual matter related with extension of time between PAM from 2006 and JKR form 2007
    by: Yong Yoong Kee
    Published: (2011)
  • A study into design, costing to the soft and hard landscaping work to a project at Johor
    by: Gan Xin Yi
    Published: (2014)
  • A study into the process of manufacturing of cement sand bricks in a factory for local market
    by: Lee Jet Shi
    Published: (2014)
  • A study into the refurbishment of an existing cafeteria in INTI International University
    by: Chan Yin Pang
    Published: (2014)

Search Options

  • Advanced Search

Need Help?

  • Search Tips

Besucherzähler einbinden
Loading...