Skip to content
Toggle navigation
VuFind
All Fields
Title
Author
Subject
Call Number
ISBN/ISSN
Find
Advanced
A study into delay and extensi...
Preview
Cite this
Export Record
Export to RefWorks
Export to EndNoteWeb
Export to EndNote
Export to MARC
Export to MARCXML
A study into delay and extension of time in construction contract based on PAM from 2006 and PWD Form 203A 2007
Main Author:
Tay Khar Wern
Format:
Book
Published:
Nilai:
INTI International University,
January 2014.
Subjects:
Project paper --
>
Quantity Surveying Enginnering
Construction --
>
Composit materials
Holdings
Description
Preview
Similar Items
Staff View
Similar Items
A study into the 'extension of time' clause 23 PAM form of contract PAM 1998 and its implication to the client and contractor
by: Yap Chor Yin
Published: (2012)
A study into the comparison of contractual matter related with extension of time between PAM from 2006 and JKR form 2007
by: Yong Yoong Kee
Published: (2011)
A study into design, costing to the soft and hard landscaping work to a project at Johor
by: Gan Xin Yi
Published: (2014)
A study into the process of manufacturing of cement sand bricks in a factory for local market
by: Lee Jet Shi
Published: (2014)
A study into the refurbishment of an existing cafeteria in INTI International University
by: Chan Yin Pang
Published: (2014)
×
Loading...