Preparation of bills of quantities and costing for earthwork in Brunei for site preparation with cut and fill method

Main Author: Ayu De Chuan
Format: Book
Published: Nilai: INTI International University, January 2014.
Subjects:
LEADER 00998pamaa2200193 4500
001 0000052676
005 20140715090000.0
008 140708s2014 eng
090 0 0 |a TA545   |b AYU 2014 
100 1 1 |a Ayu De Chuan  
245 1 0 |a Preparation of bills of quantities and costing for earthwork in Brunei for site preparation with cut and fill method   |c Ayu De Chuan. 
260 0 0 |a Nilai:   |b INTI International University,   |c January 2014. 
300 |a 34p:   |b ill.;   |c 30 cm. 
500 0 0 |a DQSE 82 
500 0 0 |a Diploma in Quantity Surveying Enginnering January 2014 
502 0 0 |a Being a final project submitted to INTI International University as a requirements for Diploma in Quantity Surveying (Semester January 2014) under the managment and supervision of Faculty of Engineering and Information Technology, INTI International University 
650 0 0 |a Construction --   |x Composit materials  
650 0 0 |a Project paper --   |x Quantity Surveying Enginnering  
901 |u http://intilib.intimal.edu.my