A study into the process of manufacturing of cement sand bricks in a factory for local market
Main Author: | Lee Jet Shi |
---|---|
Format: | Book |
Published: |
Nilai:
INTI International University,
January 2014.
|
Subjects: |
Similar Items
-
Preparation of bills of quantities for the structural steel work and costing for the factory at Mukim Klang, Selangor
by: Lian Jun Wei
Published: (2013) -
A study into design, costing to the soft and hard landscaping work to a project at Johor
by: Gan Xin Yi
Published: (2014) -
A study into delay and extension of time in construction contract based on PAM from 2006 and PWD Form 203A 2007
by: Tay Khar Wern
Published: (2014) -
A study into the refurbishment of an existing cafeteria in INTI International University
by: Chan Yin Pang
Published: (2014) -
The preparation of bills of quantities and costing for the finishes of a double storey bungalow
by: Justin Lim Jin Litt
Published: (2014)