|
|
|
|
LEADER |
00878pamaa2200181 4500 |
001 |
0000052481 |
005 |
20140421090000.0 |
008 |
140421s2013 eng |
090 |
0 |
0 |
|a TA545
|b PRI 2013
|
100 |
1 |
1 |
|a Priyanut a/p Phon Chai
|
245 |
1 |
0 |
|a Industrialized building system in Malaysian construction industry
|c Priyanut a/p Phon Chai.
|
260 |
0 |
0 |
|a Nilai:
|b INTI International University,
|c November 2013.
|
300 |
|
|
|a xv, 126p:
|b ill.;
|c 30 cm.
|
500 |
0 |
0 |
|a BQSI 8
|
502 |
0 |
0 |
|a Dissertation submitted as a partial fulfillment of the requirement for the Bachelor of Science (Hons.) In Quantity Surveying submitted to INTI International University and under the managment and supervision of Faculty of Science, Technology, Engineering and Mathematics
|
650 |
0 |
0 |
|a Dissertations, academic --
|x Engineeering
|
650 |
0 |
0 |
|a Building system
|
901 |
|
|
|u http://www.intimal.edu.my
|