|
|
|
|
LEADER |
00833pamaa2200181 4500 |
001 |
0000052480 |
005 |
20140421090000.0 |
008 |
140421s2013 eng |
090 |
0 |
0 |
|a TA545
|b CHU 2013
|
100 |
1 |
1 |
|a Chua Mei King
|
245 |
1 |
0 |
|a Waste management in construction site
|c Chua Mei King.
|
260 |
0 |
0 |
|a Nilai:
|b INTI International University,
|c November 2013.
|
300 |
|
|
|a xiv, 97p:
|b ill.;
|c 30 cm.
|
500 |
0 |
0 |
|a BQSI 7
|
502 |
0 |
0 |
|a Dissertation submitted as a partial fulfillment of the requirement for the Bachelor of Science (Hons.) In Quantity Surveying submitted to INTI International University and under the managment and supervision of Faculty of Science, Technology, Engineering and Mathematics
|
650 |
0 |
0 |
|a Dissertations, academic --
|x Engineeering
|
650 |
0 |
0 |
|a Waste management
|
901 |
|
|
|u http://www.intimal.edu.my
|