|
|
|
|
LEADER |
00875pamaa2200181 4500 |
001 |
0000052479 |
005 |
20140421090000.0 |
008 |
140421s2013 eng |
090 |
0 |
0 |
|a TA545
|b CHE 2013
|
100 |
1 |
1 |
|a Chen Kok Wai
|
245 |
1 |
0 |
|a Crisis of manpower resources in Malaysian construction industry
|c Chen Kok Wai.
|
260 |
0 |
0 |
|a Nilai:
|b INTI International University,
|c November 2013.
|
300 |
|
|
|a v, 62p:
|b ill.;
|c 30 cm.
|
500 |
0 |
0 |
|a BQSI 6
|
502 |
0 |
0 |
|a Dissertation submitted as a partial fulfillment of the requirement for the Bachelor of Science (Hons.) In Quantity Surveying submitted to INTI International University and under the managment and supervision of Faculty of Science, Technology, Engineering and Mathematics
|
650 |
0 |
0 |
|a Dissertations, academic --
|x Engineeering
|
650 |
0 |
0 |
|a Manpower resources --
|x Construction
|
901 |
|
|
|u http://www.intimal.edu.my
|