Preparation of bills of quantities and costing for the sub-structure work excluding piling works to a factory at Mukim Klang, Selangor
Main Author: | Haw Yong Yuan |
---|---|
Format: | Book |
Published: |
Nilai:
INTI International University,
January 2013.
|
Subjects: |
Similar Items
-
Preparation of bills of quantities for the structural steel work and costing for the factory at Mukim Klang, Selangor
by: Lian Jun Wei
Published: (2013) -
Preparation bills of quantities and costing for the sub-structure work of a shop in Seremban
by: Wai Jun Wah
Published: (2013) -
Preparation of bills of quantities and costing to the sub-structure work to semi-detached bungalow
by: Koo Yik How
Published: (2013) -
Preparation of bills of quantities and costing of the structural steel to a factory in Klang
by: Liew Chen Ying
Published: (2010) -
A study into preparation of bill of quantity of piling and sub-structure work to an elevated water tank and costing
by: Hiranuma Masaru
Published: (2011)