Skip to content
Toggle navigation
VuFind
All Fields
Title
Author
Subject
Call Number
ISBN/ISSN
Find
Advanced
Preparation of bills of quanti...
Preview
Cite this
Export Record
Export to RefWorks
Export to EndNoteWeb
Export to EndNote
Export to MARC
Export to MARCXML
Preparation of bills of quantities and costing for the sub-structure work excluding piling works to a factory at Mukim Klang, Selangor
Main Author:
Haw Yong Yuan
Format:
Book
Published:
Nilai:
INTI International University,
January 2013.
Subjects:
Construction
Project paper --
>
Quantity Surveying Enginnering
Holdings
Description
Preview
Similar Items
Staff View
Similar Items
Preparation of bills of quantities for the structural steel work and costing for the factory at Mukim Klang, Selangor
by: Lian Jun Wei
Published: (2013)
Preparation bills of quantities and costing for the sub-structure work of a shop in Seremban
by: Wai Jun Wah
Published: (2013)
Preparation of bills of quantities and costing to the sub-structure work to semi-detached bungalow
by: Koo Yik How
Published: (2013)
Preparation of bills of quantities and costing of the structural steel to a factory in Klang
by: Liew Chen Ying
Published: (2010)
A study into preparation of bill of quantity of piling and sub-structure work to an elevated water tank and costing
by: Hiranuma Masaru
Published: (2011)
×
Loading...