Preparation bills of quantities and costing for external wall finishes, internal floor finishes and ceiling finishes of double story house in Pekan Mantin

Main Author: Ng San Ping
Format: Book
Published: Nilai: INTI International University, January 2013.
Subjects:
LEADER 01012pamaa2200193 4500
001 0000052447
005 20140506090000.0
008 140417s2013 eng
090 0 0 |a TA545   |b NG 2013 
100 1 1 |a Ng San Ping  
245 1 0 |a Preparation bills of quantities and costing for external wall finishes, internal floor finishes and ceiling finishes of double story house in Pekan Mantin   |c Ng San Ping. 
260 0 0 |a Nilai:   |b INTI International University,   |c January 2013. 
300 |a v, 27p:   |b ill.;   |c 30 cm. 
500 0 0 |a DQSE 63 
500 0 0 |a Diploma in Quantity Surveying Enginnering January 2013 
502 0 0 |a Being a final project submitted to INTI International University as a requirements for Diploma in Quantity Surveying (Semester 7: Aug 2013) under the managment and supervision of Faculty of Engineering and Information Technology, INTI International University 
650 0 0 |a External wall  
650 0 0 |a Project paper --   |x Quantity Surveying Enginnering  
901 |u http://intilib.intimal.edu.my