Skip to content
VuFind
Advanced
  • Search
  • Preparation of bills of quanti...
  • Preview
  • Cite this
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
    • Export to MARC
    • Export to MARCXML
Cover Image
QR Code

Preparation of bills of quantities and costing to the sub-structure work to semi-detached bungalow

Main Author: Koo Yik How (Author)
Format: Book
Published: Nilai: INTI International University, January 2013.
Subjects:
Project paper -- > Quantity Surveying Enginnering
Quantity Surveying
  • Holdings
  • Description
  • Preview
  • Similar Items
  • Staff View

Similar Items

  • Preparation of bills of quantities and costing for the sub-structure work of a semi-detached house in Kelantan
    by: Chang Vivian
    Published: (2013)
  • Preparation bills of quantities and costing for the sub-structure work of a shop in Seremban
    by: Wai Jun Wah
    Published: (2013)
  • A study into preparation of bill of quantity of piling and sub-structure work to an elevated water tank and costing
    by: Hiranuma Masaru
    Published: (2011)
  • Preparation of bills of quantitative and costing for the substructure work to a bungalow in Rawang, Selangor
    by: Chin Chee Yang
    Published: (2010)
  • A study into the design, taking off, bills of quantities and costing of renovation semi-bungalow project at Jalan Ipoh Kuala Lumpur
    by: Wong Yinn Han
    Published: (2013)

Search Options

  • Advanced Search

Need Help?

  • Search Tips

Besucherzähler einbinden
Loading...