Skip to content
VuFind
Advanced
  • Preparation of bills of quanti...
  • Preview
  • Cite this
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
    • Export to MARC
    • Export to MARCXML
Cover Image
QR Code

Preparation of bills of quantities and costing for substructure and structural steelwork to a warehouse of reference to SMM2 in Sarawak

Main Author: Teng Toh Chee (Author)
Format: Book
Published: Nilai: INTI International University, January 2013.
Subjects:
Project paper -- > Quantity Surveying Enginnering
  • Holdings
  • Description
  • Preview
  • Similar Items
  • Staff View

Similar Items

  • Preparation of bills of quantitative and costing for the substructure work to a bungalow in Rawang, Selangor
    by: Chin Chee Yang
    Published: (2010)
  • Preparation of bill of quantities and costing of structural steel to a warehouse
    by: Chia Yuan Heng
    Published: (2012)
  • Preparation of bills of quantities and costing for the work below lowest floor finished to a bungalow reference to SMM2 in Selangor
    by: Tan Kim Ann
    Published: (2012)
  • Preparation of bills of quantities and costing to the sub-structure work to semi-detached bungalow
    by: Koo Yik How
    Published: (2013)
  • Preparation of bills of quantities and costing for all the doors and windows of bungalow with reference to the standard method of measurement 2
    by: Toh Ying Shi
    Published: (2012)

Search Options

  • Advanced Search

Need Help?

  • Search Tips

Besucherzähler einbinden
Loading...