Preparation of bills of quantities and costing for the work below lowest floor finished to a bungalow reference to SMM2 in Selangor
| Main Author: | Tan Kim Ann |
|---|---|
| Format: | Book |
| Published: |
Nilai:
INTI International University,
August 2012.
|
| Subjects: |
Similar Items
-
The preparation of bills of quantities and costing for the finishes of a three storey bungalow in Rawang
by: Sharmilah Manoharan
Published: (2013) -
The preparation of bills of quantities and costing for the finishes of a double storey bungalow
by: Justin Lim Jin Litt
Published: (2014) -
Preparation of bills of quantities and costing to the sub-structure work to semi-detached bungalow
by: Koo Yik How
Published: (2013) -
Preparation of bills of quantitative and costing for the substructure work to a bungalow in Rawang, Selangor
by: Chin Chee Yang
Published: (2010) -
Preparation bills of quantities and costing for external wall finishes, internal floor finishes and ceiling finishes of double story house in Pekan Mantin
by: Ng San Ping
Published: (2013)