Preparation of bills of quantities and costing for the work below lowest floor finished to a bungalow reference to SMM2 in Selangor

Main Author: Tan Kim Ann
Format: Book
Published: Nilai: INTI International University, August 2012.
Subjects:
LEADER 00984pamaa2200193 4500
001 0000050965
005 20130123090000.0
008 130113s2012 eng
090 0 0 |a TA545   |b TAN 2012 
100 1 1 |a Tan Kim Ann  
245 1 0 |a Preparation of bills of quantities and costing for the work below lowest floor finished to a bungalow reference to SMM2 in Selangor   |c Tan Kim Ann. 
260 0 0 |a Nilai:   |b INTI International University,   |c August 2012. 
300 |a 65p:   |b ill.;   |c 30 cm. 
500 0 0 |a DQSE 41 
500 0 0 |a Diploma in Quantity Surveying Enginnering August 2012 
500 0 0 |a Number 3 
502 0 0 |a Being a project report submitted to INTI International University as a requirements for Diploma in Quantity Surveying Enginnering August 2012 under the managment and supervision of Faculty of Engineering and Information Technology, INTI International University 
650 0 0 |a Project paper --   |x Quantity Surveying Enginnering  
901 |u http://icmlibrary.intimal.edu.my