A study into the 'extension of time' clause 23 PAM form of contract PAM 1998 and its implication to the client and contractor

Main Author: Yap Chor Yin
Format: Book
Published: Nilai: INTI International University, January 2012.
Subjects:
LEADER 00959pamaa2200181 4500
001 0000050189
005 20120606090000.0
008 120606s2012 eng
090 0 0 |a TA545   |b YAP 2012 
100 1 1 |a Yap Chor Yin  
245 1 2 |a A study into the 'extension of time' clause 23 PAM form of contract PAM 1998 and its implication to the client and contractor   |c Yap Chor Yin. 
260 0 0 |a Nilai:   |b INTI International University,   |c January 2012. 
300 |a 46p:   |b ill.;   |c 30 cm. 
500 0 0 |a Diploma in Quantity Surveying Enginnering January 2012 
500 0 0 |a Number 7 
502 0 0 |a Being a project report submitted to INTI International University as a requirements for Diploma in Quantity Surveying Enginnering January 2012 under the managment and supervision of Faculty of Engineering and Information Technology, INTI International University 
650 0 0 |a Project paper --   |x Quantity Surveying Enginnering  
901 |u http://icmlibrary.intimal.edu.my