|
|
|
|
LEADER |
00924pamaa2200181 4500 |
001 |
0000049137 |
005 |
20110614090000.0 |
008 |
110614 eng |
090 |
0 |
0 |
|a TA545
|b HIR 2011
|
100 |
1 |
1 |
|a Hiranuma Masaru
|
245 |
1 |
2 |
|a A study into preparation of bill of quantity of piling and sub-structure work to an elevated water tank and costing
|c Hiranuma Masaru.
|
260 |
0 |
0 |
|a Nilai:
|b INTI International University,
|c January 2011.
|
300 |
|
|
|a 33p:
|b ill.;
|c 30 cm.
|
500 |
0 |
0 |
|a Diploma in Quantity Surveying Enginnering January 2011
|
500 |
0 |
0 |
|a Number 6
|
502 |
0 |
0 |
|a Being a project report submitted to INTI International University as a requirements for Diploma in Quantity Surveying Enginnering January 2011 under the managment and supervision of Faculty of Engineering and Technology, INTI International University
|
650 |
0 |
0 |
|a Project paper --
|x Quantity Surveying Enginnering
|
901 |
|
|
|u www.intimal.edu.my
|