Preparation of bill of quantities and costing of the brickworks, doors, and windows with all the finishes for floors, walls, ceiling, and sanitary fitting for the construction of shop lot
| Main Author: | Chen Kok Wai |
|---|---|
| Format: | Book |
| Language: | English |
| Published: |
Nilai:
INTI International University,
January 2011.
|
| Subjects: |
Similar Items
-
Preparation bills of quantities and costing for external wall finishes, internal floor finishes and ceiling finishes of double story house in Pekan Mantin
by: Ng San Ping
Published: (2013) -
Prepare bills of quantities and costing for the floor, wall and ceiling finishes to a bangolow in Mukim Ampang, Wilayah Perseketuan
by: Tham Chee Seng
Published: (2013) -
Preparation bills of quantities (BQ) and costing for floors, wall and ceiling finishes to two units of four-storey shop offices in Mukim Kuala Dungun, Daerah Dungun, Terengganu Darul Iman
by: Pok Jye Hwoi
Published: (2013) -
Preparation of bill of quantities regarding architecture work of 3-storey shop lots in Kuala Lumpur
by: Lee Kian Sing
Published: (2012) -
Preparation of bills of quantities and costing on the superstructure work to a double storey shop lot in Segamat, Johor, Malaysia
by: Shoon Woon Kian
Published: (2013)