|
|
|
|
LEADER |
01105pamaa2200193 4500 |
001 |
0000023854 |
005 |
20110126090000.0 |
020 |
0 |
0 |
|a [ nil ]
|
090 |
0 |
0 |
|a T55.9
|b TEW 1999
|
100 |
1 |
0 |
|a TEW LAI SENG
|
245 |
1 |
0 |
|a Interactive time study tool kit by Tew Lai Seng. 2. Midterm capacity requirement planning with Monte Carlo simulation by Effendi Jo. 3. Packaging from recycle paper by Chew Wai Cheng. 4. Power saving conveyor belt by lee Sew Beng. 5. Redesign mobile kitchen by Lim Ching Moi. 6. Redesign the inner part of the car by Ong Cheng Hoong. 7. Reduce the accident rate in packaging department of Kilang Papan Galas Setia Sdn. Bhd. by Lock Ros Shin. 8. Second class lever system by Loo Kok Yong. 9. Welding station design in school of engineering and technology workshop by Mah Shee Yin. 10. Work design tool kit by Wong Ren Hor.
|
260 |
0 |
0 |
|a Nilai:
|b INTI College Malaysia,
|c August 1999.
|
300 |
|
|
|a Volume II.
|
650 |
0 |
0 |
|a Project paper
|
650 |
0 |
0 |
|a Industrial engineering --
|x Project paper
|
700 |
1 |
1 |
|a EFENDI JO
|
700 |
1 |
1 |
|a CHEW WAI CHENG
|
700 |
1 |
1 |
|a Lee Sew Beng
|
700 |
1 |
1 |
|a Lim Ching Moi
|