Mould design for space lower body by Abdullah Zulfairis Bin Zulkifli. 2. Plant layout improvement (Printelligence Sdn. Bhd) by using systematic layout planning (SLP) by Foong Wan Teng. 3. Process improvement method (short line) by Koh Yat Loong. 4. Redesign baby cart with human factors concern by Teoh Yeow Tong. 5. Redesign house phone with human factor concern by Bong Kok Lian. 6. Redesign toothbrush ergonomically by Tan Poh Ling.
Main Author: | YEE CHIN YAO |
---|---|
Other Authors: | FOONG WAN TEN, KOH YAT LOONG, TEOH YEOW TONG, BONG KOK LIANG, TAN POH LING |
Format: | Book |
Published: |
Nilai:
INTI College Malaysia,
April 1998.
|
Series: | Diploma in industrial engineering
|
Subjects: |
Similar Items
-
The ergonomically design of the computer keyboard by Cheong Kam Chuan. 2. Plan layout improvement (Eve Marketing Sdn Bhd) by using systematic layout planning (SLP) by Jean Ng Sueh Mooi. 3. Plant layout improvement by using systematic layout planning (SLP) by Chua Kim Seng. 4. Process analysis for circuit breaker manufacture by Ng Tzuu Bin. 5. Redesign cloth hanger and manufacturing process study by Ng Soon Huat. 6. Redesign house phone with human factor concern by Bong Kok Liong.
by: CHEONG KAM CHUAN
Published: (1998) -
Redesign the factory layout for INKI-PLAS Holdings Sdn. Bhd. by Yap Kam Thong. 2. Redesign the portable trolley by Low Kok Beng. 3. Use systematic layout planning (SLP) to redesign the layout of a coffee roaster factory by Chai Ming Arng. 4. Use systematic layout planning (SLP) technique to element a section of the production shop flow in a manufacturing company by Goh Kwang Loon. 5. Using Excel to simulate EOQ and ROP by Thow Sheue Fein.
by: YAP KAM THONG
Published: (1998) -
Modular design of children playground product by Tan Siang Thye. 2. Project management by Sam Yen Nee. 3. Redesign a shoe size numbering machine ergonomically by Liao Sock Min. 4. Redesign a simplified office desk for production by Ngan Ze Hong. 5. Redesign a white board to minimize the occurence of the repetitive motion syndrome by Ooi Wooi Hun. 6. Redesign an ergonomic electric hair dryer by Pang Kok On.
by: TAN SIANG THYE
Published: (1999) -
Design and provide cost estimate for the redesign and refurbishment of a classroom in private University
by: Wong Mei Yee
Published: (2012) -
Improve an existing manufacturing process using computer simulaation model approach by Lee Tian Yong. 2. Pole mounted fruit wrapper by Yulianti. 3. Rebalancing production line in Jemaramas Jaya Sdn. Bhd. for an aptimun production process by Koh Kwee Yah. 4. Redesign a functional layout in a selected factory by Ong Kok Yong. 5. Redesign the portable trolley by Foo Chin Giap.
by: LEE TIAN YONG
Published: (2000)