|
|
|
|
LEADER |
00931pamaa2200193 4500 |
001 |
0000020661 |
005 |
20110126090000.0 |
020 |
0 |
0 |
|a [ nil ]
|
090 |
0 |
0 |
|a T55.9
|b YAP 1998
|
100 |
1 |
0 |
|a YAP KAM THONG
|
245 |
1 |
0 |
|a Redesign the factory layout for INKI-PLAS Holdings Sdn. Bhd. by Yap Kam Thong. 2. Redesign the portable trolley by Low Kok Beng. 3. Use systematic layout planning (SLP) to redesign the layout of a coffee roaster factory by Chai Ming Arng. 4. Use systematic layout planning (SLP) technique to element a section of the production shop flow in a manufacturing company by Goh Kwang Loon. 5. Using Excel to simulate EOQ and ROP by Thow Sheue Fein.
|
260 |
0 |
0 |
|a Nilai:
|b INTI College Malaysia,
|c 1998.
|
300 |
|
|
|a Volume III.
|
650 |
0 |
0 |
|a Project paper
|
650 |
0 |
0 |
|a Industrial engineering --
|x Project paper
|
700 |
1 |
1 |
|a LOW KOK BENG
|
700 |
1 |
1 |
|a CHAI MING ARNG
|
700 |
1 |
1 |
|a GOH KWANG LOON
|
700 |
1 |
1 |
|a THOW SHEUE FEIN
|