Translate management plan into detailed plans utilising manufacturing resource planning (MRP II) by How Yin Yin. 2. Manufacturing resource planning (MRP II) by Yik Swofino. 3. Simulation of material requirement planning (MRP II) in a manufacturing environment by Tan Hui Shing. 4. Manufacturing resource planning (MRP II) by Choo Pei. 5. Design a baby-chair for dinner purpose with human factor consideration by Tan Kang Kai.

Main Author: HOW YIN YIN
Other Authors: YIK SWOFINO, TAN HUI SHING, CHOO PEI, TAN KANG KAI
Format: Book
Published: Nilai: INTI College Malaysia, 1998.
Subjects:
LEADER 00900pamaa2200193 4500
001 0000020657
005 20110126090000.0
020 0 0 |a [ nil ]  
090 0 0 |a T55.9   |b HOW 1998 
100 1 0 |a HOW YIN YIN  
245 1 0 |a Translate management plan into detailed plans utilising manufacturing resource planning (MRP II) by How Yin Yin. 2. Manufacturing resource planning (MRP II) by Yik Swofino. 3. Simulation of material requirement planning (MRP II) in a manufacturing environment by Tan Hui Shing. 4. Manufacturing resource planning (MRP II) by Choo Pei. 5. Design a baby-chair for dinner purpose with human factor consideration by Tan Kang Kai. 
260 0 0 |a Nilai:   |b INTI College Malaysia,   |c 1998. 
300 |a Volume II. 
650 0 0 |a Project paper  
650 0 0 |a Industrial engineering --   |x Project paper  
700 1 1 |a YIK SWOFINO  
700 1 1 |a TAN HUI SHING  
700 1 1 |a CHOO PEI  
700 1 1 |a TAN KANG KAI