Evaluate the efficiency of the queuing system in a banking institution using Arena software by Loh Tee Chiat. 2. Simulation of manufacturing resource planning (MRP II) in manufacturing environment for making a plug by Ng Bee Tin. 3. Time study for light commercial vehicle at Associated Motor Industries by Ng Shya Hoong. 4. Design an ideal work cell that can be integrated in a specific robotic handler by Siow Ka Yee.

Main Author: LOH TEE CHIAT
Other Authors: NG BEE TIN, NG SHYA HOONG, SIOW KA YEE
Format: Book
Published: Nilai: INTI College Malaysia, 1997.
Subjects:
LEADER 00866pamaa2200181 4500
001 0000020654
005 20110126090000.0
020 0 0 |a [ nil ]  
090 0 0 |a T55.9   |b LOH 1997 
100 1 0 |a LOH TEE CHIAT  
245 1 0 |a Evaluate the efficiency of the queuing system in a banking institution using Arena software by Loh Tee Chiat. 2. Simulation of manufacturing resource planning (MRP II) in manufacturing environment for making a plug by Ng Bee Tin. 3. Time study for light commercial vehicle at Associated Motor Industries by Ng Shya Hoong. 4. Design an ideal work cell that can be integrated in a specific robotic handler by Siow Ka Yee. 
260 0 0 |a Nilai:   |b INTI College Malaysia,   |c 1997. 
300 |a Volume V. 
650 0 0 |a Project paper  
650 0 0 |a Industrial engineering --   |x Project paper  
700 1 1 |a NG BEE TIN  
700 1 1 |a NG SHYA HOONG  
700 1 1 |a SIOW KA YEE