To solve a production problem in a particular process line in XXX Company in Klang Valley by Chai Pooi Hang. 2. Establish a set of standard times for changing a car wheel in a tyre shop using work sampling technique by Chin Set Tze. 3. Designing a ballpoint pen with human factor consideration by Kerk Ser Yong. 4. Build a small cafe manufacturing process that perform a series of handling operations by Lau Lee Ping. 5. Design a table-top ironing board with optimum operational and ergonomic consideration by Lee Sin Yuon.
Main Author: | CHAI POOI HANG |
---|---|
Other Authors: | CHIN SET TZE, KERK SER YONG, LAU LEE PING, LEE SIN YUON |
Format: | Book |
Published: |
Nilai:
INTI College Malaysia,
1997.
|
Subjects: |
Similar Items
-
A particular place
by: HOCKING
Published: (1989) -
Fundamental considerations in language testing
by: BACHMAN
Published: (1990) -
A+ OPERATING system technologies : study guide
Published: (2001) -
A study into a development process of a housing construction in Klang Valley
by: Lim Siew Yen
Published: (2012) -
A course in digital signal processing
by: PORAT
Published: (1997)