Development of charts for the design of circular column to BS8100 with 6 numbers of reinforcement by Voon Tung San. 2. Development of charts for the design of pile caps to BS8110 with 2-, 3-, 4-, and -5 piles by Nyu Soon Yiap. 3. Drainage system adopted in flood mitigation by Peh Boon Wei. 4. Geotechnic considerations in the methods of construction and design for caissons.
Main Author: | |
---|---|
Other Authors: | , , |
Format: | Book |
Published: |
Nilai:
INTI College Malaysia,
1999.
|
Subjects: |
LEADER | 00821pamaa2200181 4500 | ||
---|---|---|---|
001 | 0000020624 | ||
005 | 20110126090000.0 | ||
020 | 0 | 0 | |a [ nil ] |
090 | 0 | 0 | |a TJ145 |b VOO 1999 |
100 | 1 | 0 | |a VOON TUNG SAN |
245 | 1 | 0 | |a Development of charts for the design of circular column to BS8100 with 6 numbers of reinforcement by Voon Tung San. 2. Development of charts for the design of pile caps to BS8110 with 2-, 3-, 4-, and -5 piles by Nyu Soon Yiap. 3. Drainage system adopted in flood mitigation by Peh Boon Wei. 4. Geotechnic considerations in the methods of construction and design for caissons. |
260 | 0 | 0 | |a Nilai: |b INTI College Malaysia, |c 1999. |
300 | |a Volume V. | ||
650 | 0 | 0 | |a Project paper |
650 | 0 | 0 | |a Civil engineering -- |x Project paper |
700 | 1 | 1 | |a NYU SOON YIAP |
700 | 1 | 1 | |a PEH BOON WEI |
700 | 1 | 1 | |a CHAW SIEW HWA |